UPCOMING REVISIONS – Contracts & Agreements

Upcoming Revisions – Timing TBD

The University of Michigan is updating the terms and conditions utilized in all general contractor and construction manager contracts.  The updated documents are available for your viewing in draft form below. The primary objectives achieved in this update include:

  • aligned the language, format and requirements of the general conditions for the general contractor projects and construction manager projects
  • eliminated the supplementary conditions document by incorporating those  terms into the standard general conditions
  • document reformatted to more closely mirror the AIA standard format
  • removed items more appropriate for the general requirements section of the specifications
  • updated language and requirements related to insurance
  • updated other miscellaneous sections to more closely align to current industry standards.

Construction:
LUMP SUM GENERAL CONTRACT – STANDARD FORM
CONSTRUCTION MANAGEMENT CONTRACT

Equipment with Installation:
EQUIPMENT FURNISH AND INSTALL CONTRACT

Design:
DESIGN AGREEMENT – STANDARD LUMP SUM PROJECT
DESIGN AGREEMENT – PROJECT WITH CONSTRUCTION MANAGER
PROFESSIONAL SERVICES PO TERMS AND CONDITIONS
For services valued at $100,000 or less

DESIGN DELIVERABLES